Chapter 9: Periodic ACM Surveillance
Periodic review of the O&M program and re-inspection of all ACM identified in the building is essential. Re-inspection will insure that any damage or deterioration of ACM is detected and corrective actions taken. Re-inspection should be conducted at least annually by the asbestos program manager and at three year intervals by an accredited inspector. Documentation of inspection results should be placed in the permanent asbestos file.